Noverde
Noverde
Image

What it costs

Three ways the work is bought, and the things that move each figure.

Three ways the work is bought

Fixed fee

First inventory

Your first footprint, counted rather than estimated.

from
£14,000
£22,500
Icon
Boundary set and written down before anything is counted
Icon
Full inventory, with a factor register behind every line
Icon
Methodology note an auditor can argue with
Icon
The spreadsheet, handed over, yours to keep
Image
Most companies end up here

Annual programme

Measurement, reduction and the report, run as one.

from
£4,200
£6,400
a month
Icon
Everything in a first inventory, re-run each year
Icon
Reduction plan with the arithmetic behind each target
Icon
Supplier data collection out of tier one and tier two
Icon
Your disclosure drafted, caveats in the body

Day rate

Assurance support

A figure that exists, prepared for your assurer.

£1,150
£1,350
a day
Icon
A read of what you have, and what will be challenged
Icon
Evidence pack assembled in the assurer's own order
Icon
Liaison through the engagement, questions answered in writing
Icon
A response log you keep for the next cycle

What moves the fee

If yours is not here, ask it in the first call. We would rather answer it before a proposal than inside one.

A spend model takes days. Primary data out of tier one and tier two takes months, and is the difference between a figure and a defensible one.

Four metered sites in one country is not eleven across three. Joint ventures and leased assets are decided before counting starts, not after.

Half-hourly meter exports cost nothing to use. A folder of PDF invoices is a fortnight of someone reading them, and we say so at the quote.

Limited assurance changes what has to be evidenced. Reasonable assurance changes how it is filed, and roughly how long the whole thing takes.

CSRD asks for more than a voluntary report, and asks for it in a particular order. ISSB asks differently again.

Every engagement carries a methodology note written so a sceptical board member can argue with it, an assumption log, including the assumptions we would rather not have made, the raw data and the model, handed over, in a format you can open, a named analyst who signed the figure and will take the call about it, and caveats in the body of the report rather than in a footnote. If the work finds that you need less of it than you were quoted for, that is the call we make, and the quote comes down with it.

A broad valley landscape seen from the air

Tell us what you need to be able to prove.

A specialist reads the question before anyone quotes for it, and will say plainly if we are not the right firm for it.