Noverde
Noverde
Image
Service ·
8–12 weeks

Renewable Energy

Procurement, on-site generation and the arithmetic behind a credible net-zero date, including the years it does not bend.

What we cover

Procurement, on-site generation and the arithmetic behind a date. We read the contracts you already hold line by line — tariffs, certificates, power purchase agreements — and say plainly which of them change the emissions figure and which only change the paperwork. A certificate bought after the fact is not the same claim as a contract that brought new capacity onto the grid, and the plan says which you have.

On-site options are costed against the same yardstick: what they actually displace, metered at the site rather than apportioned from a group total. The result is a supply plan you can put in front of a finance director and an assurer on the same afternoon.

  • A supply plan covering procurement, contracts and on-site generation
  • On-site options costed against what each one actually displaces
  • A net-zero date with the arithmetic that produces it
  • The years the curve does not bend, marked rather than smoothed
A row of wind turbines standing in open country

Where the boundary falls

Which sites count, and which contracts count for them. A group-level average will always look tidier than eleven sites metered one at a time, and it will always hide the sites moving the wrong way. We meter site by site, read each one monthly, and keep the ones that got worse in the same table as the ones that improved.

 

Eleven sites, metered one at a time. A group average would have hidden the two that moved the wrong way, and those were the two worth knowing about.

What arrives at the end

Eight to twelve weeks from the first data pull you receive the supply plan, the costed on-site options and a net-zero date with every step of its arithmetic attached.

The date is the least interesting part of it. What survives scrutiny a year later is the working underneath, and that is handed over in a form you can re-run yourself.

What you receive

One line, with its working attached

Every figure arrives like this one: the factor it used, where that factor came from, and whether the number was measured or modelled.

Metered

Read off a meter, not estimated.

Factor

The published source, with its date.

Uncertainty

How far the figure could move.

Inventory · line 014

Specimen

Scope 2 · purchased electricity

Period

1 Jan – 31 Dec 2025

12 months, no gaps

Site

Dunmore plant

IE-CRK-02 · meter A, half-hourly

1,284,000

kWh

Metered

×

0.207

kgCO₂e / kWh

DESNZ 2025 · 26.06.2025

=

265.8

tCO₂e

Reported

Method

Location-based

Assumption

None

Uncertainty

±1.2%

Prepared by R. Oakes · checked 14.01.2026

Nothing is described to you. It is handed over.

At the end of the engagement these files move to you, in formats you can open without us, with every figure traceable to the line it came from.

Image

Handover ·

Renewable Energy

Yours to keep

Turnaround

8–12 weeks

from the first boundary conversation

Files handed over

4

openable formats, not a portal login

Signed by

1

named analyst, still here next year

Document

What it answers

Share of the file

Pages

Status

Supply plan

What the total is, line by line

48

Handed over

On-site options

Where every factor came from

26

Handed over

Net-zero date

What was modelled, and why

14

Handed over

The model itself

So you can re-run it next year

—

On request

Page counts are from the last engagement of this size. If a figure in any of them cannot be traced back to the line it came from, it does not leave the building.

A broad valley landscape seen from the air

Tell us what you need to be able to prove.

A specialist reads the question before anyone quotes for it, and will say plainly if we are not the right firm for it.