Procurement, on-site generation and the arithmetic behind a date. We read the contracts you already hold line by line — tariffs, certificates, power purchase agreements — and say plainly which of them change the emissions figure and which only change the paperwork. A certificate bought after the fact is not the same claim as a contract that brought new capacity onto the grid, and the plan says which you have.
On-site options are costed against the same yardstick: what they actually displace, metered at the site rather than apportioned from a group total. The result is a supply plan you can put in front of a finance director and an assurer on the same afternoon.

Which sites count, and which contracts count for them. A group-level average will always look tidier than eleven sites metered one at a time, and it will always hide the sites moving the wrong way. We meter site by site, read each one monthly, and keep the ones that got worse in the same table as the ones that improved.
Eleven sites, metered one at a time. A group average would have hidden the two that moved the wrong way, and those were the two worth knowing about.
Eight to twelve weeks from the first data pull you receive the supply plan, the costed on-site options and a net-zero date with every step of its arithmetic attached.
The date is the least interesting part of it. What survives scrutiny a year later is the working underneath, and that is handed over in a form you can re-run yourself.
What you receive
Every figure arrives like this one: the factor it used, where that factor came from, and whether the number was measured or modelled.
Metered
Read off a meter, not estimated.
Factor
The published source, with its date.
Uncertainty
How far the figure could move.
Inventory · line 014
Specimen
Scope 2 · purchased electricity
Period
1 Jan – 31 Dec 2025
12 months, no gaps
Site
Dunmore plant
IE-CRK-02 · meter A, half-hourly
1,284,000
kWh
Metered
×
0.207
kgCO₂e / kWh
DESNZ 2025 · 26.06.2025
=
265.8
tCO₂e
Reported
Method
Location-based
Assumption
None
Uncertainty
±1.2%
Prepared by R. Oakes · checked 14.01.2026
At the end of the engagement these files move to you, in formats you can open without us, with every figure traceable to the line it came from.

Turnaround
8–12 weeks
from the first boundary conversation
Files handed over
4
openable formats, not a portal login
Signed by
1
named analyst, still here next year
Document
What it answers
Share of the file
Pages
Status
Supply plan
What the total is, line by line
48
Handed over
On-site options
Where every factor came from
26
Handed over
Net-zero date
What was modelled, and why
14
Handed over
The model itself
So you can re-run it next year
—
On request
Page counts are from the last engagement of this size. If a figure in any of them cannot be traced back to the line it came from, it does not leave the building.