Noverde
Noverde
Image
Service ·
6–10 weeks

Reporting & Disclosure

CSRD, ISSB or a voluntary report, written so that the numbers and the caveats arrive on the very same page.

What we cover

CSRD, ISSB or a voluntary report. We start by mapping each disclosure requirement onto a figure you actually hold, which is the moment most reporting projects discover what is missing. The map is the plan: it says what exists, what has to be measured, and what will be disclosed as not yet available.

Then the drafting. The numbers and the caveats arrive on the same page, in the body of the text, because a caveat moved to a footnote is a caveat the reader was not meant to find.

  • A disclosure map tying every requirement to a figure or a gap
  • A draft report written for a reader, not for a checklist
  • A caveat register naming every qualification and where it sits
  • The requirements you cannot yet meet, disclosed as such
Image

Where the boundary falls

Which entities the report covers and which standard it answers to, settled before a word is drafted. Subsidiaries consolidated for financial reporting are not automatically the right boundary for an emissions one, and prior-year comparatives have to be built on the same basis or they are not comparatives at all.

 

The disclosure draft came back with the caveats in the body rather than a footnote. Our board asked better questions because of it.

What arrives at the end

Six to ten weeks from the disclosure map to a draft your board can read without a glossary beside it. Most of that time goes on the mapping rather than the writing, because once it is clear which figures exist and which do not, the report largely writes itself.

You keep the map and the caveat register alongside the report. When the standard changes, and it will, the map shows exactly which paragraphs have to move rather than sending you back to the beginning with a blank page.

What you receive

One line, with its working attached

Every figure arrives like this one: the factor it used, where that factor came from, and whether the number was measured or modelled.

Metered

Read off a meter, not estimated.

Factor

The published source, with its date.

Uncertainty

How far the figure could move.

Inventory · line 014

Specimen

Scope 2 · purchased electricity

Period

1 Jan – 31 Dec 2025

12 months, no gaps

Site

Dunmore plant

IE-CRK-02 · meter A, half-hourly

1,284,000

kWh

Metered

×

0.207

kgCO₂e / kWh

DESNZ 2025 · 26.06.2025

=

265.8

tCO₂e

Reported

Method

Location-based

Assumption

None

Uncertainty

±1.2%

Prepared by R. Oakes · checked 14.01.2026

Nothing is described to you. It is handed over.

At the end of the engagement these files move to you, in formats you can open without us, with every figure traceable to the line it came from.

Image

Handover ·

Reporting & Disclosure

Yours to keep

Turnaround

6–10 weeks

from the first boundary conversation

Files handed over

4

openable formats, not a portal login

Signed by

1

named analyst, still here next year

Document

What it answers

Share of the file

Pages

Status

Disclosure map

What the total is, line by line

48

Handed over

Draft report

Where every factor came from

26

Handed over

Caveat register

What was modelled, and why

14

Handed over

The model itself

So you can re-run it next year

—

On request

Page counts are from the last engagement of this size. If a figure in any of them cannot be traced back to the line it came from, it does not leave the building.

A broad valley landscape seen from the air

Tell us what you need to be able to prove.

A specialist reads the question before anyone quotes for it, and will say plainly if we are not the right firm for it.