Impact case
GWh shifted from grid supply · eleven sites, 2021–2026
On-site generation and power purchase agreements replacing grid supply, metered at each site rather than apportioned from a single group figure.
Sixty-two gigawatt hours moved off grid supply between 2021 and 2026. The number could have been produced in an afternoon by taking the group's total consumption and the group's total renewable contracts and dividing one by the other. That version would have been higher, tidier, and would have hidden the three sites where nothing changed at all.
Instead each site was metered on its own and read monthly for five years, and the sites that went backwards stayed in the table beside the ones that improved.
On-site generation and purchased supply were kept separate throughout, because they support different claims and fail in different ways. Generation stops while a roof is being worked on; a contract stops when its term runs out, and only one of those ever shows up in a meter reading.

Heat. The programme covered electricity only, and three of the eleven sites still run gas boilers that no part of this number touches. Reporting the electricity figure without saying so would have made a partial decarbonisation read as a complete one.
A group average would have hidden the two sites that moved the wrong way. Those were the two worth a conversation.
Five years of site-level monthly data, the contract analysis, and the uncorrected figures alongside the degree-day corrected ones. Keeping both versions means a mild winter cannot be mistaken for an improvement, which is the distinction a single group figure had been quietly swallowing.
The people who signed off the figures, on what the work was like to sit through.


They opened with the three numbers in our last report they could not stand behind. It was an uncomfortable hour and it saved us a correction.


Our Scope 3 was a spend model wearing a measurement badge. They replaced the half of it that mattered and left the rest labelled as an estimate.


The disclosure draft came back with the caveats in the body rather than a footnote. Our board asked better questions because of it.